Free HDD Bore Cost Calculator
Quick ballpark for a directional bore: production, days on site, a low/high cost range and $/ft. Estimates only β real prices depend on your ground, your rig and your market.
Productionβft/day
Days on siteβ
Low estimateβ
High estimateβ
$/ftβ
Want a real bid packet? Let us do the bidding for you β (we prep it; you review, sign and submit)
Email me this estimate
How it estimates
- Unit price range ($/ft, dirt): 1β1.5" $8β18 Β· 1Γ2" $12β24 Β· 2Γ2" $15β30 Β· 3β4 duct / 4" $18β36 Β· 2Γ4" / 6" $24β50 Β· 8β12" $40β76.
- Soil: cobble Γ1.4β1.8, rock Γ2β3 (rock adders on public bid tabs run +$32 to +$120/ft).
- Depth: +3% per foot past 6 ft. Region: Γ0.9 to Γ1.35.
- Production (ft/day, small/mid rig): dirt 600β900 for 1β2", down to ~250 for 8β12"; cobble ~45%; rock ~20%. Each shot adds ~ΒΌ day setup. Crew-day cost (days Γ day rate) is blended with the unit range so the low/high cover both ways contractors price.
- Mobilization: fixed charge, commonly $700β$5,000 β why short bores cost more per foot.
Sources
- City of Cuyahoga Falls, OH β 2024 Directional Boring bid tab (1Γ2" HDPE $12.50β27.80/ft; 2Γ2" $17.50β37.36; 1Γ6" $24β51; rock adder $32β120/ft)
- City of Loveland, CO β directional boring bid (Attachment A) (2" HDPE $12/ft soil, $20 rock; mobilization $700)
- Underground Drilling LLC β boring cost table (fiber 2β4" $6β30/ft; 4β8" $20β40; 8β12" cobble $40β76)
- Nevantin β What directional boring costs (2β4" soft soil $8β20/ft; mobilization $1,500β5,000+; rock $100+/ft)
- Trinity Boring Solutions β HDD cost per foot (rock 2β3Γ soil; hardpan +25β40%)
Production rates and extras are Underground Weekly planning assumptions from field experience, not quotes. Always verify locates (call 811) and get a real bid.
Run your crew's bore logs, locates and jobs in one app: BoreCrew AI